D26 · Condominium
Lentor Gardens Residences
Lentor Gardens, Lentor Hills. Developed by Kingsford Huray Development Pte Ltd.
What is on the record
Compiled from the published source below and checked on that date. Where a figure is disputed between sources it is left out rather than averaged, and where the only price available was a portal listing range it is omitted — those ranges mix developer stock with subsale and are not a developer price.
- Developer
- Kingsford Huray Development Pte Ltd
- District
- D26 · Outside Central
- Tenure
- 99-year leasehold
- Type
- Condominium
- Total units
- 499
- Unit mix
- 2 to 5 bedrooms; no one-bedroom units
- Expected completion
- 2030
- Status
- Now selling
- Nearest MRT
- Lentor (Thomson-East Coast Line)
- Address
- 68 Lentor Gardens, Singapore 788841
- Earliest published PSF
- $2,350 psf
- Earliest published price
- $2,050,000
Completion is reported as 2029 on the listing page and December 2030 in launch coverage. The later date is used here.
Source: published report. Figures verified 2026-08-02
Developments are listed here as a compiled reference. Nothing on this page is a claim of exclusivity, and no figure is a substitute for the developer’s own price list on the day you buy.
Measured, not asserted
What is actually within reach
Straight-line distances from this development’s site coordinate. Straight-line is the measure MOE uses for school registration priority; it is not a walking route, and a hundred metres on this list can be a five-minute detour on the ground.
Primary schools within 2km
Walking minutes are derived from the straight line at roughly 80 m a minute, which makes them a floor rather than an estimate. The real route is always longer.
Same district, then same region
Other developments worth comparing
D26 · Outside Central
Springleaf Residence
Upper Thomson Road, Springleaf
Expected completion 2031
D26 · Outside Central
Lentoria
Lentor Hills Road
Expected completion 2027
D26 · Outside Central
Hillock Green
Lentor Central
Expected completion 2028
D18 · Outside Central
Pinery Residences
Bedok Reservoir Road, Tampines West
Expected completion 2030
Availability and pricing change weekly
Unit availability, the current price list and any developer incentive come from the developer’s own system on the day, and go out of date faster than any website can follow. Rather than publish a number that will be wrong by the weekend, ask and it will be checked with you.
On a developer sale the commission comes from the developer, not from you. Having someone walk the unit mix, check the stack and do the stamp duty arithmetic costs you nothing.
Ask Joel about Lentor Gardens Residences